PROJECT TO EXPORT 50Mt PER YEAR OF HIGH-GRADE IRON ORE
Investments in infrastructure secured by the very high-grade Banalia iron ore deposit which has already been surface prospected in 1974. This iron deposit was to supply the Maluku steelworks which was a failure because of its very poor location. Surface prospecting was carried out by the Italian and Belgian companies SICAI/TRACTIONNEL, cf http://www.thaurfin.com/SICAI.pdf The prospecting results have been entered into the Excel file published on http://www.thaurfin.com/SICAI-TRACTIONNEL.xlsx According to a surface survey of a sedimentary deposit sloping at approximately 60° which has formed hills, and extrapolated to a depth of only 70m, the resources would be969Mt@65.55%Fe The results of this survey were discussed at this URL : https://thaurfin.com/Iron-deposit.pdf
Geological prospecting
Logistic
T he value of iron ore is often contingent upon its logistics. The   project   for   an   East/West   railway   to   transport   300Mt   of   iron   ore   from   the former    Eastern    Province    is    under    study,    the    cost    is    $50    billion    and    the execution time is well over ten years. Thaurfin Ltd, holder of 3PRs 1323, 1324 & 1325, proposes to transport 50Mt per year by river down the Congo River cf https://thaurfin.com/RIVER-TRANSPORT.pdf
PROJECT TO EXPORT 50Mt PER YEAR OF HIGH-GRADE IRON ORE
Geological prospecting
Investments in infrastructure secured by the very high-grade Banalia iron ore deposit which has already been surface prospected in 1974. This iron deposit was to supply the Maluku steelworks which was a failure because of its very poor location. Surface prospecting was carried out by the Italian and Belgian companies SICAI/TRACTIONNEL, The prospecting results have been entered into this Excel file According to a surface survey of a sedimentary deposit sloping at approximately 60° which has formed hills, and extrapolated to a depth of only 70m, the resources would be 969Mt@65.55%Fe The results of this survey were discussed at this URL : https://thaurfin.com/Iron-deposit.pdf
Logistic
The value of iron ore is often contingent upon its logistics. The   project   for   an   East/West   railway   to   transport   300Mt   of   iron   ore   from   the   former   Eastern Province is under study, the cost is $50 billion and the execution time is well over ten years. Thaurfin Ltd, holder of 3PRs 1323, 1324 & 1325, proposes to transport 50Mt per year by river down the Congo River, cf https://thaurfin.com/RIVER-TRANSPORT.pdf